Story

Pavement Sealing Work Continues in Salina

October 26, 2025 road work, construction, Salina
Pavement Sealing Work Continues in Salina

Starting Monday, October 27, through Friday, October 31, Circle C Paving & Construction of Goddard, Kansas will work on the City of Salina's annual pavement crack sealing project. The work will take place between 7:30 a.m. and 5 p.m. on several streets, including Baker, 10th, Santa Fe, Oakdale Dr, 3rd, Westchester, Pacific, Gypsum, Connecticut, Walnut, 4th, and Berkshire. Access to properties will be maintained, but temporary single-lane closures are expected. Motorists are advised to proceed with caution. This project is part of the City's 2025 Crack Seal annual maintenance program, fully funded at $486,000.


Share this story
Verified Organization Program
$99/year annual membership

We publish your events, job listings, and stories for you on a consistent schedule. You can still post yourself anytime, but you do not have to.

  • Done-for-you publishing on a consistent schedule: we handle your events, job listings, and stories for you.
  • You can still create your own events, jobs, or stories anytime, but you do not have to manage the workload yourself.
  • Monthly business outreach: just reply with bullets, photos, flyers, or links and we turn it into draft content.
  • Unlimited job postings - we can publish them for you, or you can post them yourself any time.
  • Unlimited Featured Events (normally $5/day) - we can publish and distribute them for you before the event.
  • Local SEO Package - we'll assist your site in optimizing for local search so you're found before your competitors
  • Priority placement in the category search for the Best In Salina directory
Learn About Verified
Salina311

Sign In