Story

Kansas Crop Progress Report: Winter Wheat Condition Strong, Cotton and Sunflower Harvests Behind Schedule

December 10, 2025 agriculture, crops, winter wheat, cotton, sunflowers, USDA, Kansas, farming
Kansas Crop Progress Report: Winter Wheat Condition Strong, Cotton and Sunflower Harvests Behind Schedule

MANHATTAN, Kan. - For the week ending December 7, 2025, Kansas farmers had 4.8 days suitable for fieldwork, according to the USDA's National Agricultural Statistics Service.


Topsoil moisture supplies rated 4% very short, 14% short, 75% adequate, and 7% surplus.

Subsoil moisture supplies rated 8% very short, 18% short, 70% adequate, and 4% surplus.


Winter wheat condition rated 1% very poor, 4% poor, 25% fair, 59% good, and 11% excellent.


Cotton harvested was 65%, well behind 86% last year and 87% for the five-year average. Sunflowers harvested was 85%, behind 97% last year and 99% average.


Pasture and range conditions rated 5% very poor, 8% poor, 28% fair, 52% good, and 7% excellent.

This publication marks the last weekly Crop Progress report issued for the 2025 season.

The USDA extended appreciation to county FSA and extension staff who supplied information for these reports.

Monthly reports will be issued from December through February, with weekly reports resuming in early March for the 2026 season.


Share this story
Verified Organization Program
$99/year annual membership

We publish your events, job listings, and stories for you on a consistent schedule. You can still post yourself anytime, but you do not have to.

  • Done-for-you publishing on a consistent schedule: we handle your events, job listings, and stories for you.
  • You can still create your own events, jobs, or stories anytime, but you do not have to manage the workload yourself.
  • Monthly business outreach: just reply with bullets, photos, flyers, or links and we turn it into draft content.
  • Unlimited job postings - we can publish them for you, or you can post them yourself any time.
  • Unlimited Featured Events (normally $5/day) - we can publish and distribute them for you before the event.
  • Local SEO Package - we'll assist your site in optimizing for local search so you're found before your competitors
  • Priority placement in the category search for the Best In Salina directory
Learn About Verified
Salina311

Sign In